Service Documents

TEMX INSTRUCTION 1.2015

Issue link: https://docs.hic.us/i/445637

Contents of this Issue

Navigation

Page 67 of 247

To decide a design to embroider and the color change order 55 1 2 3 4 5 6 7 8 9 10 11 Chapter 4 PT10 4-2. To decide color change sequence (Needle Bar Selection) This setting is unnecessary when the color change order is already included as the condition data in the design to be embroidered from now. 4-2-1. Explanation on the screen [a] Design (of which data is set) to be embroidered from now [b] Step The section divided by color change code in the design data. The first section is called step 1, and the next section is called step 2. Step display differs depending on with/without setting of "Auto Color Change (AC)". [c] Offset mark The illustrated example shows that the frame moves to the front automatically after finishing of step 3 (p.161). However, to move the frame, the setting of "Automatic Offset" is necessary (p.159). 2 Needle Bar Selection 1 2 3 4 5 6 5 B 7 9 1 3 2 6 4 [a] [c] Design to be embroidered from now [b] Step Offset mark 1 5 Step No. Needle bar No. Setting color of needle bar The color can be changed in each needle bar (p.133). With setting Without setting

Articles in this issue

view archives of Service Documents - TEMX INSTRUCTION 1.2015