Brother

GTX Daily Operations Guide

Issue link: https://docs.hic.us/i/1183668

Contents of this Issue

Navigation

Page 2 of 14

35 Seconds Pre Treatment 1/2 distilled water 5 - 5,5 Bars 75 - 80 PSI 180°C 360°F 35 Seconds Pre Treatment 1/2 distilled water 5 - 5,5 Bars 75 - 80 PSI 180°C 360°F 35 Ink Curing 0,7 - 1,4 Bars 10 - 20 PSI 180°C 360°F 160°C 320°F 35 Seconds Seconds 3:30 Minutes Minutes Ink Curing Ink Curing 0,7 - 1,4 Bars 180°C 160°C 320°F 10 - 20 PSI 360°F TUNNEL DRYER HEATPRESS VERY IMPORTANT The Brother GTX should ALWAYS be left with Power ON NEVER shut OFF the printer except if requested by the display informations! Power is requested to perform the needed recirculation of the inks from time to time. HEAT PRESS SETTINGS for Pre-Treatment DRYING Check the Real Temperature with a Probe or with Strips to be sure that you are safe for washability! HEATPRESS & TUNNEL DRYER SETTINGS for INK CURING POWER NEVER POWER OFF THE PRINTER! 3 Use Silicon sheet on the heat press to cover the pre-treatment and clean the surface every 5 T-shirts! You can also use Parchment paper when curing the Pre-treatment in order to minimize needing to clean off the covers and to minimize issues with fibers standing up on the garment In the event that power goes out or your printer has an error during printing. Push the Carriage back all the way to the left to dock it and use the Fixing Pin to lock it in place. Watch the Video: Using and Storing the CR Holding Pin

Articles in this issue

Links on this page

view archives of Brother - GTX Daily Operations Guide