35
Seconds
Pre
Treatment
1/2 distilled
water
5 - 5,5
Bars
75 - 80
PSI
180°C
360°F
35
Seconds
Pre
Treatment
1/2 distilled
water
5 - 5,5
Bars
75 - 80
PSI
180°C
360°F
35
Ink
Curing
0,7 - 1,4
Bars
10 - 20
PSI
180°C
360°F
160°C
320°F
35
Seconds Seconds
3:30
Minutes Minutes
Ink
Curing
Ink
Curing
0,7 - 1,4
Bars
180°C
160°C
320°F
10 - 20
PSI
360°F
TUNNEL DRYER
HEATPRESS
VERY IMPORTANT
The Brother GTX should ALWAYS be left with Power ON
NEVER shut OFF the printer except if requested by the display informations!
Power is requested to perform the needed recirculation of the inks from time to time.
HEAT PRESS SETTINGS for Pre-Treatment DRYING
Check the Real Temperature with a Probe or with Strips to be sure that you are safe for washability!
HEATPRESS & TUNNEL DRYER SETTINGS for INK CURING
POWER
NEVER POWER OFF THE PRINTER!
3
Use Silicon sheet on the heat press to cover the pre-treatment and clean the surface every 5 T-shirts!
You can also use Parchment paper when curing the Pre-treatment in order to minimize needing to
clean off the covers and to minimize issues with fibers standing up on the garment
In the event that power goes
out or your printer has an error
during printing. Push the
Carriage back all the way to
the left to dock it and use the
Fixing Pin to lock it in place.
Watch the Video: Using and Storing the CR Holding Pin