Service Documents

TMBP + TMBR Users Guide

Issue link: https://docs.hic.us/i/1260917

Contents of this Issue

Navigation

Page 118 of 249

To adjust finishing of embroidering 106 Chapter 5 PT10 (3) To select stitch length to remove (4) To execute 7-6. To change thread tension (Frame Start Timing) 7-6-1. Explanation of the screen 7-6-2. How to operate The following is an example that Frame Start Timing is set to "270". (1) To set to main screen (2) To press F2 key while pressing SET To change this value, consult the distributor. Some operating condition could cause occurrence of fault in thread trimming and affect sewing. 0.5 24 Target number of stitches will be displayed. Are you ready? 280 Timing to start moving the frame (Value is of main shaft angle) 230 Thread tension Weak 280 Strong 2 Frame Start Timing CAUTION ! SET + F2 screen will be displayed.

Articles in this issue

view archives of Service Documents - TMBP + TMBR Users Guide