Issue link: https://docs.hic.us/i/1260917
Inspection, Repair 215 Chapter 10 5. Inspection, Repair Before inspection, be sure to turn OFF the original power supply. Some circuits are still applied voltage even if the original power supply was turned OFF. Wait until these circuits are completely out of voltage (4 minutes) and then start working. Inspection point Action Inspection cycle Attaching of each type of cover Attach all the covers. At start of working Setting condition of embroidery thread Set it correctly. Check breakage and/or bent of needle. Replace the needle. Lubricating condition of each section Lubricate. Belt tension (main shaft, X/Y drive system) Consult the distributor. Once/3 months Before repairing the machine, be sure to turn OFF the original power supply. Some circuits are still applied voltage even if the original power supply was turned OFF. Wait until these circuits are completely out of voltage (4 minutes) and then start working. If the machine needs the repair, the repair must be done only by the service personnel assigned and trained by Tajima or qualified technician. (Consult your distributor.) Do not change the specification nor modify the parts of the machine without due consultation with Tajima. Such modification may have the risk against the operational safety. When restarting the machine after repairs, attach all removed covers etc. as they were. For the repair, use Tajima genuine parts for replacement. WARNING ! WARNING ! CAUTION ! SQ12