Electrical Requirements • Ensure that the proper electrical capacity is present and available for use. • Ensure that the heat press is going to be put on its own dedicated circuits that meet the power requirements as listed by the OEM. For example, there are a few common items listed to the right. • The heat press needs to be kept on its own dedicated breaker/circuit. If an Air Fusion is purchased a compressor will also be needed and on dedicated line. • A Pretreatment machine can share an outlet as long as it has a low amperage consumption such as a Schulze product. • The GTX600 can not be hardwired and must require a plug. Plug is not provided and must be available for installation tech. • Brother provides a 6' cord in the Starter Kit • 24/7 power supply will be required Electrical Requirements Power Power Consumptions GTX600 Single-phase 200 V; 240 V 50/60 Hz 5 Amp max Schulze IV Single-phase 120-240 V, 50/60 Hz 2 Amp MAXX2G120 Single-phase 120 V, 50/60 Hz 15 Amp MAXX2G220 Three-phase 240 V, 50/60 Hz 15 Amp I understand that proper electrical will need to be provided and available for the equipment being purchased. The equipment will need to be wired and ready for use before the time of installation.

Articles in this issue

view archives of Brother - GTX600 Presite Survey