7
3 installation Instructions
This chapter introduces the important pre-installa�on procedure. Please understand carefully
before opera�ng the machine.
3.1 How to get the machine out from box
The Powder/Shaker is shipped in a sturdy wooden crate.
1. Raise the crate and place 4pcs wooden blocks under the 4 metal boxes on the bo�om of the
crate.
2. Set the crate back down which will allow the crate to drop below the metal blocks.
3. Reposi�on the fork li�, raise the powder/shaker out of the crate and gentle place on its wheels.
3.2 How to connect power
Li� the electrical access plate from right side of the machine to access the electrical panel.
A licensed electrician should connect the wiring to the machine.
Note:
The machine must be well grounded.