Service Documents

TMARK INSTRUCTION 7.2014

Issue link: https://docs.hic.us/i/445658

Contents of this Issue

Navigation

Page 241 of 261

227 Chapter 11 Maintenance QS04 2-4. Inspection 2-5. Repair Be sure to turn off the main power supply before working. Even if the main power supply is turned off, some circuits are still applied voltage. Wait until they are not applied voltage completely (4 minutes), and then start working. Inspection point Contents of inspection Inspection cycle Each belt in main shaft drive system Tension of belt, degree of wear, existence of crack Once/3 months X- and Y-axis drive belts Tension of belt, degree of wear, existence of crack Rotating, sliding section Degree of wear If the machine needs repairs, the repairs must be done only by the service personnel assigned and trained by Tajima or qualified technician. (consult your distributor.) Do not change the specification nor modify the parts of the machine without due consultation with Tajima. Such modification may risk the operational safety. Be sure to turn off the main power supply before working. Even if the main power supply is turned off, some circuits are still applied voltage. Wait until they are not applied voltage completely (4 minutes), and then start working. When restarting the machine after repairs, attach all removed covers etc. as they were. For the machine repairs, use TAJIMA genuine parts for replacement. WARNING ! WARNING ! ! ! CAUTION ! !

Articles in this issue

view archives of Service Documents - TMARK INSTRUCTION 7.2014